Loading scenario artifacts…
Feasibility & Economics
Water, Farmer Costs & Hardware TCO
Modeled Seasonal Water Use
Empirical P05–P95 scenario spread (not a confidence interval). All policies receive paired forcing.
Hardware Bill of Materials (BOM)
Published DFRobot/Pi references exclude landed shipping/taxes; unquoted parts use prototype allowances.
Lifecycle Ownership Cost (TCO)
Includes $30/node install, 5%/yr maintenance, and discrete sensor/node replacements (no salvage value).
Regional Suitability & Local Savings Gate
Local currency estimates remain gated until tariffs, FX rates, pump curves, and installed quotes are verified.
Explore hypothetical USD tariff & payback sensitivity grid
Edge Benchmarks & Field Protocol Schema
Host timings measure the Python policy kernel only; physical MCU memory, radio range, and power remain unmeasured.